These documents comprise all of the final submittals received from the consulting firm identified to develop the conceptual designs associated with the overall library Building Project.
Documents
| Document Title | Date |
|---|---|
| Library Redevelopment Plan Part I – 50% DRAFT | 05/31/2019 |
| Library Redevelopment Plan Part I – FINAL | 06/02/2019 |
| Library Redevelopment Plan Programming and Conceptual Design Study | 10/24/2019 |
| Library Special Collections Study Part I – DRAFT | 08/09/2019 |
| Library Special Collections Study Part 2 | 09/25/2019 |
| Library Special Collections Study Part 2 – FINAL | 12/11/2019 |